Why Do Sewage Treatment Plants Need to Be Built?

Getting connected to main sewers should be the first thought for anyone planning a new development. They are usually the most cost-effective and dependable way to deal with your wastewater. Obtaining a mains sewer connection, on the other hand, is not always possible. In some cases, the distance between the nearest sewer and the land layout make it impossible to have your property serviced by a mains sewer. Sewage treatment plants and other alternatives can help with this. The operation of a sewage treatment plant means that it can be installed almost anywhere with an electrical connection.

Sewage Treatment Plant (STP) Manufacturer

What is Industrial Sewage Waste?

Waste water is generated as infrastructure develops and water is used for various purposes such as domestic and commercial. Sewage is made up of waste water from households, hotels, and may also include industrial waste water.

Sewage treatment plant processes include primary, secondary, or biological, and tertiary treatment processes to improve the quality of wastewater for recycling.

STP Plant – Sewage Treatment Plants Manufacturer

We Design, Fabricate, Supply, Erection and Commissioning  STP Plant ( Sewage Treatment Plants ) for treating sewage generated by Industry, large colonies, Hotels, Hospitals, IT Parks and commercial buildings.

Now a days the Sewage Treatment Plant ( STP Plant ) became statutory requirement of all the State Pollution Control Boards, everybody, whether Hotelier or Industrialist were looking for economical, easy to install and operate compact type STP Plant. Since the land is extremely expensive, very few industries could afford the large treatment units as recommended by most of the Consultants.

We are being pioneer STP Plant Manufacturer in the field from last 15 years and always in the search of latest and techno-commercially viable technology, system by which the need of the society can be easily satisfied.

The Principle

Its working on the principle of Aerobic Treatment with the help of aerobic bacteria, which is most conventional and proven method throughout the world. Envicare’s Modified Septic Tank (MST) Systems – Its works on principle on anaerobic digestion.

Technologies Used

  • ASP : Activated Sludge Process
  • MBBR : Moving Bed Bio reactor
  • SAFF : Submerged aerated Fixed Film
  • SBR : Sequential Bioreactor
  • MBR : Membrane Bio Reactor

Types of STP Plant

Containerised Type STP Plant

Capacity : 25 – 150 KLD
Technology : MBBR / SAFF / MBR

Features :

  • Semi-automatic Operation.
  • Required less space as compared to conventional design.
  • Very Compact and Great aesthetic.
  • Reduced Installation and commissioning time on site.
  • Plug and play operation.
  • Easy Dismantling and transportation.
  • Standard and made to order product.
  • Civil Work – Collection Tank and Container Foundation.

Typical Industries : IT Complex, Hotels & Restaurants, Labour Camps, etc.

Package Type Sewage Treatment Plant

Capacity : 25 – 250 KLD
Technology : MBBR / SAFF / SBR / MBR

Features :

  • Semi-automatic Operation.
  • Easy to transport & Installation
  • Erection and commissioning by Trained and experienced Envicare Team
  • MOC of Tank = MS-FRP (Coated) /MSEP.
  • Completely above ground Installation.
  • Only Sewage collection tank in Civil (RCC)

Typical Industries : Medium Scale Industries, Housing Complex, Labour Camps, etc.

Civil Type STP Plant

Capacity : 25 KLD TO 5000 KLD
Technology : ASP / MBBR / SAFF / SBR / MBR

Features :

  • Semi-automatic Operation
  • Minimum Maintenance Required
  • Underground Civil Work ( RCC ) Construction
  • Erection and commissioning by Trained and experienced Envicare Team
  • Treated Water can use for Irrigation, Gardening, Flushing Purpose

Typical Industries : Large Societies, Hospitals, Hotels, Large Industries, Commercial Complex.

STP – Compact Modular Type 

Capacity : 1 to 15 KLD
Technology : SAFF / MBBR

Features :

  • Fully Skid Mounted
  • Semi-automatic Operation
  • Very Compact, required less space.
  • Can mount in 4-5 working days on site.
  • Easy Dismantling and transportation (In assembled conditions)
  • Process Tanks – In Civil ( RCC / Brick )

Typical Industries : Schools, Small Scale Industries, Small malls, Bunglow, Restaurants, etc.